Equipment required
Breathaplasta Smooth
Hawk, trowel and plastering tools
Recommended plaster thickness
Approx. 4mm total thickness.
Coverage per 20kg Smooth bag
Approx. 12 square metres at 3mm thickness
Setting time per coat
Approximately 60-90 minutes.
Surface preparation
Ensure the existing plaster surface is in reasonable condition, is well consolidated and is not crumbling or coming away from the background. Any loose plaster should be removed, and the surface should be in sound condition before overcoating.
If the existing plaster surface is smooth, consider applying a coat of breathable plaster primer to add a key and provide grip for the new plaster.
Mist or brush the existing plaster surface with water to help control suction.
Recommended plaster application
Mix Smooth to approx. 8 litres of clean water per 20kg bag of dry powder used.
Mix the plaster using a paddle mix for approx. 3 minutes.
Base coat of Smooth at 1-2mm.
Top coat of Smooth at 1-2mm.
After the top coat is set, return to the plaster and use a trowel to polish the surface until a super smooth finish is achieved. Do not spray more water onto the plaster and be careful not to overwork it at this stage.
Bag calculator
Use this calculator to work out how many bags of Universal to order for your job.
Bags required: